Loading...

Clients & Projects

Projects
Home / Clients & Projects / Projects

Wastewater Engineering

 

ERINCO, to date, continues to lead in the area of municipal wastewater engineering, having provided planning, design and supervision inputs for sewerage projects throughout the country. These have included planning inputs to derive Sewerage Catchment and Sludge Management Strategies, detailed engineering design and supervision of municipal sewers, major lifting/pumping installations as well as treatment plants including upgrading of existing works in major cities including Kuala Lumpur, Klang, Ipoh, Kangar, Port Dickson and Melaka.

View Current Projects

View Completed Projects

 

Waste Supply Engineering

 

The firm has been involved in several major water supply projects which include design and supervision of rehabilitation works to fourteen water treatment plants in Kluang, Batu Pahat, Muar and Segamat, Johor, 1995; and Merbau Chondong Water Treatment Plant and associated Distribution Works, Pasir Mas, Kelantan, 2003. Other related water supply assignments by the firm include Integrated Water Supply Schemes for Development Projects, Intake and Industrial Water Treatment Works for UPI Paper Mill, Sg. Buloh, Independent Checking Engineers for Semangar Water Supply Project for Bank Pembangunan (BPIMB), Upgrading of Water Quality Monitoring System, Brunei Darussalam.

View Current Projects

View Completed Projects

 

Drainage &
Flood Mitigation

 

ERINCO has been appointed for several drainage and flood mitigation projects in the country. Planning and design of drainage systems by the firm integrate environmental criteria and components to achieve multiple use objectives. ERINCO is also amongst the first in the country, to incorporate GIS tools into drainage master planning and flood mapping. Projects in which the firm has been commissioned include Kulim Drainage Master Plan and Detailed Engineering Design, Kedah; Channel Improvements to Sg Klang between Jambatan Sultan Ismail to Jambatan Sultan Sulaiman, Kuala Lumpur; River Channel Improvements, Sg Liam, Selangor; and Cahaya, The Sanctuary: Sg Pelampas River Channel Improvements, Shah Alam.

View Current Projects

View Completed Projects

 

Environmental Impact
Accessment

 

ERINCO is recognised as a leading environmental consultant in the country; the firm has successfully undertaken over 250 EIA assignments covering industrial, residential development and infrastructure projects throughout the country. As a continuation to the EIA process, the firm has been engaged to prepare site and activity-specific environmental management plans (EMP’s) including erosion/sediment control plans and to perform site compliance and auditing. The firm was also commissioned by the Department of Environment, Malaysia to prepare activity-specific EIA guidelines covering coastal development industry (including petro-chemical), waste treatment/disposal and forestry. The firm has also provided consultancy services in site assessment (including audits) and rehabilitation for hill development sites as well as petroleum/petrochemical installations.

View Current Projects

View Completed Projects

 

Others

 

Civil Infrastructure, EIA-Land Development, EIA- Coastal Development, Site Contamination & Assesment, M&E Planning & Design, etc